Enforced Heat Soak Timer

Is there a parameter somewhere that I can adjust to say wait for 2 minutes after heating the bed but before doing the leveling and bed mesh? Would like to make sure the heat has settled throughout the bed.
2 Replies
blacksmithforlife
override one of the https://os.ratrig.com/docs/configuration/macros#user-macro-hooks and add in your gcode for waiting
RainingRusty
RainingRustyOP8mo ago
Thanks, will give it a try
Want results from more Discord servers?
Add your server