where can i find documentation on how to migrate existing workflows to the new novu framework?
Is there any tool to do this or does it have to be done manually? Is there a guide to make sure every step is completed thoroughly?
3 Replies
also, is it expected that the novu local studio continuously polls the bridge endpoint?
@sheena
Is there any tool to do this or does it have to be done manually? Is there a guide to make sure every step is completed thoroughly?You will have to do it manually
also, is it expected that the novu local studio continuously polls the bridge endpoint?Yes, bridge url should be public
thank you. for doing it manually though, is there a sequence to converting the triggers to make sure that duplicate notifications aren't sent? e.g. do i have to name the triggers the same thing and make sure to delete them in the novu cloud UI before deploying? or will deploying the new framework overwrite the triggers in the existing cloud ui
also, i do see that the bridge URL is public but when i'm developing in the studio it's continuously polling and logging so i wasn't sure if that's expected or not and if that will also happen in production. hopefully not.
also, how can i provide defaults to the zod payload schema that are only for use in local studio? i don't want to allow optionals or use dummy default values in the payload when i'm actually triggering the workflow in my production code but i can't seem to figure out how to define dummy values that will only be used in the studio