Project has one more Service than it actually has

My Railway dashboard shows a project with 3 services, but in reality I only have 2. I looked everywhere in the project's settings to see if I didn't have any dangling services that do not appear directly in the project's architecture view. I have 2 services, none paused. No active branches other than "production", except I used to have a "development" branch at some point but deleted it because I was trying to merge it into production but was not able to. This is not a big issue, I just think it's a small bug. [Edit] On the section for "Project Usage" > "View Cost By Service", I see the third service, but it's merely one of two services I mentioned but before I renamed it to be in lowercase. Not too sure what to make of it.
9 Replies
Percy
Percy•10mo ago
Project ID: b6b776da-c08a-4a43-bf75-b22793bdc0cd
Posho
Posho•10mo ago
b6b776da-c08a-4a43-bf75-b22793bdc0cd
Brody
Brody•10mo ago
could possibly be a phantom service, since those are still visible in some api responses, or it could just be a ui bug, either way i will flag the team
Duchess
Duchess•10mo ago
Thread has been flagged to Railway team by @Brody.
Posho
Posho•10mo ago
Sorry for the slow response. It's probably no biggie, but thank you very much.
Faraz
Faraz•10mo ago
Hey, are you still seeing this issue?
Posho
Posho•10mo ago
Hello, pretty much yeah.
No description
No description
Linear
Linear•10mo ago
Issue PRO-1290 created.
PRO-1290 - Service count is wrong
Check Discord thread. There are two services in the project, but project in dashboard says 3, and the third "phantom service" is visible in "Project Usage" > "View Cost By Service"
Status
Triage
Product
jr
jr•9mo ago